Instaleks
Reference

Baltic TPP, Narva, Estonia

Disassembly and retooling of structures inside of the operating station and also installation of the equipment for biofuel supply to the boiler at level from +0.00 meters to +56.00 meters.

More pictures

Power plant in Jyväskylä, Finland

Power plant in Jyväskylä, Finland Installation of the whole machine complex for the receipt, sorting and transporting of biofuel. Also the “key ready” assembly of the receipt and sorting buildings (frame, roof, wall panels, doors, etc.)

More pictures

Power plant in Kyrökoski, Finland

The “key ready” assembly of buildings for the receipt and sorting of biofuel (frame, roof, wall panels, doors, etc.)

More pictures

WOOD 2012 (pulp-and-paper mill), Karlstad, Sweden

Installation of the whole machine complex for the sorting of wood chips. Assembly of all service platforms for the equipment maintenance.

More pictures

Enefit 280 shale oil production plant, Auvere, Estonia

Equipment installation of transporting and cooling of shale ash.

More pictures

Granul, Varese, Estonia

Assembly of 2 supporting frames for silos and service platforms.

More pictures

Vana Kalamaja 40

Assembly of Delta girders for the inter-floor construction.

More pictures

The quays 14th, 15th and 16th at the terminal А of the Tallinn Port, Estonia

Sandwich panels installation to the floor and roof of foot passages, corrugated sheets coating, and assembly of water-resistant ply-wood on the passage’s floor. Installation of supports and emergency stairs. Fitting of the crane beam and rail for tube. Lifting and assembling of the passage itself.

More pictures

Boiler house at Stora Enso timber Mill, Ljusne, Sweden (~60 tonnes)

Installation of main frame, staircase, Sandwich panels, roof sheets, doors, windows and gratings.

More pictures

The quay 5th at the terminal D of the Tallinn Port, Estonia(~300 tonnes)

Uninstalling of old galleries. Sandwich panels installation to the floor and roof of new foot passages, corrugated sheets coating, and assembly of water-resistant ply-wood on the new passage’s floor. Installation of supports and emergency stairs. Fitting of the crane beam and rail for tube. Lifting and assembling of the passage itself.

More pictures